Solar · United Kingdom

Crick Solar Farm

Operator Voltalia UK · Owner Voltalia SA

Awaiting Construction49.9 MWData checked 16 November 2026Source record dated 2 July 2024

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Crick Solar Farm is a 49.9 MW solar farm 8 km north of Daventry, Warwickshire, United Kingdom. Its planning application (WND/2022/1084) went to West Northamptonshire on 27 January 2023 and was granted on 26 June 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 42 other energy sites within 10 km, 25 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

VOLTALIA UK LTD (07489990), active, since 2011. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Crick Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1554, Fire involving solar panels at a Market Harborough house spreads to an adjoining property, 23 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15542026Fire involving solar panels at a Market Harborough house spreads to an adjoining property23 kmSignificant
EIR-15452024Fire involving solar panels on a building under construction in Kettering30 kmMinor
EIR-14482026Roof fire at new-build house with solar panels in Wellingborough31 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
49.9 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Voltalia UK
Owner
Voltalia SA
Location
N/O Field View Cottage, Watling Street, Kilsby, Rugby, Warwickshire, CV23 8UW, United Kingdom
Planning authority
West Northamptonshire
Planning application
WND/2022/1084

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for WND/2022/1084, with what the planning evidence pack adds for this site.

Every application in West Northamptonshire · Alerts for applications and incidents near here

  • 27 January 2023 Planning application submitted
  • 26 June 2024 Planning permission granted
  • 26 June 2027 Planning permission runs out

None found. The register holds no published incident that names Crick Solar Farm. If you know of one, report it (confidential reports are anonymised).

Has Crick Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Crick Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Crick Solar Farm?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 2 July 2024.
Where is Crick Solar Farm?
8 km north of Daventry, Warwickshire, United Kingdom (postcode CV23 8UW).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).