Higher Stockbridge Farm

Operator Voltalia UK · Owner Voltalia SA

Awaiting Construction35 MWData checked 16 November 2026Source record dated 12 September 2023

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Higher Stockbridge Farm is a 35 MW solar farm 5.3 km south of Sherborne, Dorset, United Kingdom. Its planning application (WD/D/19/003181) went to Dorset on 23 December 2019 and was granted on 8 December 2021. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 13 other energy sites within 10 km, 11 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

VOLTALIA UK LTD (07489990), active, since 2011. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Higher Stockbridge Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1526, Solar panels catch fire on a retail or public building roof in South Petherton, 21 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15262025Solar panels catch fire on a retail or public building roof in South Petherton21 kmMinor
EIR-15242025Fire at a solar PV equipped house in Stoney Stratton28 kmSignificant
EIR-13962024Solar panel fire leads to Travelodge evacuation in Poole43 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
35 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Voltalia UK
Owner
Voltalia SA
Location
Higher Stockbridge Farm, Stockbridge, Sherborne, Dorset, DT9 6EP, United Kingdom
Planning authority
Dorset
Planning application
WD/D/19/003181

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for WD/D/19/003181, with what the planning evidence pack adds for this site.

Every application in Dorset · Alerts for applications and incidents near here

  • 23 December 2019 Planning application submitted
  • 8 December 2021 Planning permission granted
  • 8 December 2024 Planning permission expired

None found. The register holds no published incident that names Higher Stockbridge Farm. If you know of one, report it (confidential reports are anonymised).

Has Higher Stockbridge Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Higher Stockbridge Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Higher Stockbridge Farm?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 12 September 2023.
Where is Higher Stockbridge Farm?
5.3 km south of Sherborne, Dorset, United Kingdom (postcode DT9 6EP).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).