← Back to Dorset

Solar · United Kingdom

South Farm Solar Park

Operator Voltalia UK · Owner Voltalia SA

Operational40 MWData checked 16 November 2026Source record dated 21 December 2022

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

South Farm Solar Park is a 40 MW solar farm 5.5 km south of Blandford Forum, Dorset, United Kingdom. Its planning application (2/2019/0850/PAEIA) went to Dorset on 21 June 2019 and was granted on 25 June 2020. It has been operating since 16 December 2022. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 18 other energy sites within 10 km, 13 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 9 other sites and 239 energy sites within 40 km for South Farm Solar Park

Members see the sites and incidents around this one, and every record behind them.

VOLTALIA UK LTD (07489990), active, since 2011. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
40 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Voltalia UK
Owner
Voltalia SA
Location
South Farm, Field Dairy To Louse Lane, Spetisbury, Blandford Forum, Dorset, DT11 9DY, United Kingdom
Planning authority
Dorset
Planning application
2/2019/0850/PAEIA
First operating
2022

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 2/2019/0850/PAEIA, with what the planning evidence pack adds for this site.

Every application in Dorset · Alerts for applications and incidents near here

  • 21 June 2019 Planning application submitted
  • 25 June 2020 Planning permission granted
  • 6 January 2021 Construction started
  • 16 December 2022 Operational

None found. The register holds no published incident that names South Farm Solar Park. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has South Farm Solar Park had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names South Farm Solar Park; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of South Farm Solar Park?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 21 December 2022.
Where is South Farm Solar Park?
5.5 km south of Blandford Forum, Dorset, United Kingdom (postcode DT11 9DY).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).