Solar · United Kingdom
Crick Road
Operator Lightrock Power & Bluefield Solar Income Fund
Under Construction49.9 MWData checked 16 November 2026Source record dated 25 May 2023
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Crick Road is a 49.9 MW solar farm 8.8 km east of Rugby, Northamptonshire, United Kingdom. Its planning application (DA/2020/0200) went to West Northamptonshire on 8 April 2020 and was granted on 19 November 2020. Construction started on 3 October 2022. Its status in the Renewable Energy Planning Database (UK government) is under construction. There are 42 other energy sites within 10 km, 26 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Crick Road changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Crick Road sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1554, Fire involving solar panels at a Market Harborough house spreads to an adjoining property, 19 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1554 | 2026 | Fire involving solar panels at a Market Harborough house spreads to an adjoining property | 19 km | Significant |
| EIR-1545 | 2024 | Fire involving solar panels on a building under construction in Kettering | 28 km | Minor |
| EIR-1448 | 2026 | Roof fire at new-build house with solar panels in Wellingborough | 31 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 49.9 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Under Construction
- Operator or applicant
- Lightrock Power & Bluefield Solar Income Fund
- Location
- Land at, Crick Road, Yelvertoft, Northampton, Northamptonshire, Northamptonshire, NN6 6NA, United Kingdom
- Planning authority
- West Northamptonshire
- Planning application
- DA/2020/0200
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for DA/2020/0200, with what the planning evidence pack adds for this site.
Every application in West Northamptonshire · Alerts for applications and incidents near here
Timeline
- 8 April 2020 Planning application submitted
- 19 November 2020 Planning permission granted
- 3 October 2022 Construction started
Incidents on the register at this site
None found. The register holds no published incident that names Crick Road. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Crick Road had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Crick Road; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Crick Road?
- Under Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 25 May 2023.
- Where is Crick Road?
- 8.8 km east of Rugby, Northamptonshire, United Kingdom (postcode NN6 6NA).