Onshore wind · United Kingdom

M1 J18 Wind Turbines

Operator Airvolution Energy · Owner The Government Of Ireland

Operational4 MWData checked 16 November 2026Source record dated 16 June 2015

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

M1 J18 Wind Turbines is a 4 MW wind farm 7.6 km east of Rugby, Northamptonshire, United Kingdom. Its planning application (DA/2011/0742) went to West Northamptonshire on 9 September 2011 and was granted on 12 February 2013. It has been operating since 15 December 2014. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 48 other energy sites within 10 km, 8 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 29 other sites and 563 energy sites within 40 km for M1 J18 Wind Turbines

Members see the sites and incidents around this one, and every record behind them.

AIRVOLUTION ENERGY LIMITED (07070240), dissolved, since 2009. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Onshore wind
Capacity
4 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Airvolution Energy
Owner
The Government Of Ireland
Location
Land Between Watling Street And M1, Celtic Way, Kilsby, Northamptonshire, Northamptonshire, United Kingdom
Planning authority
West Northamptonshire
Planning application
DA/2011/0742
First operating
2014
Turbines
2

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for DA/2011/0742, with what the planning evidence pack adds for this site.

Every application in West Northamptonshire · Alerts for applications and incidents near here

  • 9 September 2011 Planning application submitted
  • 12 February 2013 Planning permission granted
  • 7 July 2014 Construction started
  • 15 December 2014 Operational

None found. The register holds no published incident that names M1 J18 Wind Turbines. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has M1 J18 Wind Turbines had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names M1 J18 Wind Turbines; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of M1 J18 Wind Turbines?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 16 June 2015.
Where is M1 J18 Wind Turbines?
7.6 km east of Rugby, Northamptonshire, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).