← Back to Warwickshire
Planning pack for this site, £295Other options

Solar · United Kingdom

Onley Park, Barby - Solar Photovoltaic PV Generation System

Operator Ministry of Justice

Awaiting Construction0.3 MWData checked 16 November 2026Source record dated 4 January 2022

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Onley Park, Barby - Solar Photovoltaic PV Generation System is a 0.3 MW solar farm 5.1 km south of Rugby, Warwickshire, United Kingdom. Its planning application (WND/2021/0631) went to West Northamptonshire on 3 November 2021 and was granted on 21 December 2021. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 34 other energy sites within 10 km, 24 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

MINISTRY OF JUSTICE LIMITED (06768774), dissolved, since 2008. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Onley Park, Barby - Solar Photovoltaic PV Generation System sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1554, Fire involving solar panels at a Market Harborough house spreads to an adjoining property, 27 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15542026Fire involving solar panels at a Market Harborough house spreads to an adjoining property27 kmSignificant
EIR-15452024Fire involving solar panels on a building under construction in Kettering36 kmMinor
EIR-21512018Sunlight reflected from a shed solar panel believed to have started a house fire in Thurnby Lodge37 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.3 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Ministry of Justice
Location
HMYOI Onley, Onley Park, Barby, Rugby, Warwickshire, CV23 8AP, United Kingdom
Planning authority
West Northamptonshire
Planning application
WND/2021/0631

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for WND/2021/0631, with what the planning evidence pack adds for this site.

Every application in West Northamptonshire · Alerts for applications and incidents near here

  • 3 November 2021 Planning application submitted
  • 21 December 2021 Planning permission granted

None found. The register holds no published incident that names Onley Park, Barby - Solar Photovoltaic PV Generation System. If you know of one, report it (confidential reports are anonymised).

Has Onley Park, Barby - Solar Photovoltaic PV Generation System had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Onley Park, Barby - Solar Photovoltaic PV Generation System; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Onley Park, Barby - Solar Photovoltaic PV Generation System?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 4 January 2022.
Where is Onley Park, Barby - Solar Photovoltaic PV Generation System?
5.1 km south of Rugby, Warwickshire, United Kingdom (postcode CV23 8AP).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).