Planning application · Solar · Basingstoke and Deane

Preston Farm, Preston Candover - Solar PV Array

Awaiting Construction28 MWApplication 21/03398/FULSubmitted 1 November 2021Granted 16 September 2022

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
21/03398/FUL
Planning authority
Basingstoke and Deane
County or area
Hampshire
Nation
England
Technology
Solar
Capacity
28 MW
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
BSR Energy
Location
Preston Candover Church Lane Preston Candover, RG25 2DS
  • 1 November 2021 Planning application submitted
  • 16 September 2022 Planning permission granted
  • 16 September 2027 Planning permission expired Date as recorded in the register

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1273, Solar panels believed to have started roof fire at house in Old Basing, 13 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12732022Solar panels believed to have started roof fire at house in Old Basing13 kmMinor
EIR-15312022Fire involving solar panels damages roof of flats in Fleet24 kmSignificant
EIR-15342022Storm Eunice loosens solar panels on Eastleigh flats27 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near RG25 2DS is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Basingstoke and Deane.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.