Onshore wind · United Kingdom
Woodmancott Down
Operator Woodmancott Wind Farm Ltd
Application Refused18 MWData checked 16 November 2026Source record dated 13 January 2015
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Woodmancott Down is a 18 MW wind farm 11 km south-west of Basingstoke, Hampshire, United Kingdom. Its planning application (13/00844/FUL) went to Basingstoke and Deane on 14 June 2013 and was refused on 26 June 2014. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 13 other energy sites within 10 km, 3 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Woodmancott Down changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 18 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Application Refused (Planning Permission Refused)
- Operator or applicant
- Woodmancott Wind Farm Ltd
- Location
- Land At Woodmancott, Grid Ref: 457347 143175 Popham Milchedever Hampshire, Hampshire, United Kingdom
- Planning authority
- Basingstoke and Deane
- Planning application
- 13/00844/FUL
- Turbines
- 6
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 13/00844/FUL, with what the planning evidence pack adds for this site.
Every application in Basingstoke and Deane · Alerts for applications and incidents near here
Timeline
- 14 June 2013 Planning application submitted
- 26 June 2014 Planning permission refused
Incidents on the register at this site
None found. The register holds no published incident that names Woodmancott Down. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Woodmancott Down had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Woodmancott Down; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Woodmancott Down?
- Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 13 January 2015.
- Where is Woodmancott Down?
- 11 km south-west of Basingstoke, Hampshire, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).