← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Onshore wind · Ards and North Down

Power Generation Development in Greyabbey

Application Submitted0.2 MWApplication LA06/2022/1257/FSubmitted 5 December 2022

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
LA06/2022/1257/F
Planning authority
Ards and North Down
County or area
North Down
Nation
Northern Ireland
Technology
Onshore wind
Capacity
0.2 MW
Status
Application Submitted (Planning Application Submitted)
Operator or applicant
Portlee Engineering Limited
Location
36A Carrowdore Road , Ballyboley Greyabbey Down, BT22 2LX
Turbines
1, 30 m to tip
  • 5 December 2022 Planning application submitted

The pack for this site lists 43 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-1134, Wind turbine tower collapses at Kilgallioch Wind Farm, Ayrshire, 78 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-11342017Wind turbine tower collapses at Kilgallioch Wind Farm, Ayrshire78 kmSignificant
EIR-10382017Wind turbine reported to have collapsed in Northern Ireland during severe storm90 kmSignificant
EIR-09222011Vestas turbine nacelle fire at Ardrossan wind farm during storm125 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 40 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near BT22 2LX is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Ards and North Down.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.