← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Solar · Somerset

Pipplepen Farm Solar Park - Solar Farm

Awaiting Construction32 MWApplication 21/00701/FULSubmitted 13 August 2021Granted 24 January 2023

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
21/00701/FUL
Planning authority
Somerset
County or area
Dorset
Nation
England
Technology
Solar
Capacity
32 MW
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Elgin Energy ES Co Limited
Location
Pipplepen Farm Solar Park, Pipplepen Lane, South Perrot, Beaminster, DT8 3HS
  • 13 August 2021 Planning application submitted
  • 24 January 2023 Planning permission granted
  • 24 January 2026 Planning permission expired

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1526, Solar panels catch fire on a retail or public building roof in South Petherton, 10 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15262025Solar panels catch fire on a retail or public building roof in South Petherton10 kmMinor
EIR-15242025Fire at a solar PV equipped house in Stoney Stratton37 kmSignificant
EIR-14682026Solar panels involved in fire that destroyed a Sidmouth bungalow40 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near DT8 3HS is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Somerset.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.