← Back to Somerset
Planning pack for this site, £295Other options

Solar · United Kingdom

Crewkerne Sewage Treatment Works, Blacknell Lane - Solar Array

Operator Wessex Water · Owner Ytl Utilities (UK) Limited

Awaiting ConstructionData checked 18 November 2026Source record dated 15 August 2023

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Crewkerne Sewage Treatment Works, Blacknell Lane - Solar Array is a solar farm in Crewkerne, Somerset, United Kingdom. Its planning application (SCC/4051/2023) went to Somerset on 5 April 2023 and was granted on 31 May 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 17 other energy sites within 10 km, 13 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

WESSEX WATER LIMITED (02366633), active, since 1989. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Crewkerne Sewage Treatment Works, Blacknell Lane - Solar Array sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1526, Solar panels catch fire on a retail or public building roof in South Petherton, 7.5 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15262025Solar panels catch fire on a retail or public building roof in South Petherton7.5 kmMinor
EIR-15242025Fire at a solar PV equipped house in Stoney Stratton36 kmSignificant
EIR-14682026Solar panels involved in fire that destroyed a Sidmouth bungalow39 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Wessex Water
Owner
Ytl Utilities (UK) Limited
Location
Crewkerne Sewage Treatment Works, Blacknell Lane, Crewkerne, Somerset, TA18 7YA, United Kingdom
Planning authority
Somerset
Planning application
SCC/4051/2023

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for SCC/4051/2023, with what the planning evidence pack adds for this site.

Every application in Somerset · Alerts for applications and incidents near here

  • 5 April 2023 Planning application submitted
  • 31 May 2023 Planning permission granted

None found. The register holds no published incident that names Crewkerne Sewage Treatment Works, Blacknell Lane - Solar Array. If you know of one, report it (confidential reports are anonymised).

Has Crewkerne Sewage Treatment Works, Blacknell Lane - Solar Array had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Crewkerne Sewage Treatment Works, Blacknell Lane - Solar Array; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Crewkerne Sewage Treatment Works, Blacknell Lane - Solar Array?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 15 August 2023.
Where is Crewkerne Sewage Treatment Works, Blacknell Lane - Solar Array?
In Crewkerne, Somerset, United Kingdom (postcode TA18 7YA).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).