← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Solar · North Yorkshire

Os Field 6800 Fence Dike Lane - Solar Farm

Awaiting Construction49.9 MWApplication 21/01362/FULSubmitted 14 May 2021Granted on appeal 27 June 2023

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
21/01362/FUL
Planning authority
North Yorkshire
Nation
England
Technology
Solar
Capacity
49.9 MW
Status
Awaiting Construction (Appeal Granted)
Operator or applicant
Lightrock Power Limited
Location
OS Field 6800 Fence Dike Lane Scruton, DL7
Appeal reference
23/00010/REFUSE
  • 14 May 2021 Planning application submitted
  • 8 August 2022 Planning permission refused
  • 8 February 2023 Appeal lodged
  • 27 June 2023 Planning permission granted
  • 27 June 2023 Appeal granted

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1502, Storm Eowyn damages solar panels at Newton Aycliffe Leisure Centre, 33 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15022025Storm Eowyn damages solar panels at Newton Aycliffe Leisure Centre33 kmMinor
EIR-11752026Rooftop solar panel fire guts NHS mental health ward in Malton52 kmSignificant
EIR-14992025Solar panels linked to fires at council buildings in Northumberland85 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near DL7 is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in North Yorkshire.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.