Planning pack for this site, £295Other options

Solar · United Kingdom

Leeming Bar Sewage Treatment, Blow Houses To Leeming Bridge - Solar Panels

Operator Downing Llp

Application Submitted0.3 MWData checked 16 November 2026Source record dated 26 July 2023

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Leeming Bar Sewage Treatment, Blow Houses To Leeming Bridge - Solar Panels is a 0.3 MW solar farm 8.1 km south-west of Northallerton, North Yorkshire, United Kingdom. Its planning application (ZB23/01383/CLP) went to North Yorkshire on 3 July 2023. Its status in the Renewable Energy Planning Database (UK government) is application submitted. There are 16 other energy sites within 10 km, 13 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

DOWNING LLP (OC341575), active, since 2008. 4 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Leeming Bar Sewage Treatment, Blow Houses To Leeming Bridge - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1502, Storm Eowyn damages solar panels at Newton Aycliffe Leisure Centre, 35 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15022025Storm Eowyn damages solar panels at Newton Aycliffe Leisure Centre35 kmMinor
EIR-11752026Rooftop solar panel fire guts NHS mental health ward in Malton52 kmSignificant
EIR-27712024Fire involves rooftop solar panels and lithium batteries on Bradford house roof61 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.3 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Submitted (Planning Application Submitted)
Operator or applicant
Downing Llp
Location
Leeming Bar SewageTreatment Leeming Bar, North Yorkshire, DL7 9RU, United Kingdom
Planning authority
North Yorkshire
Planning application
ZB23/01383/CLP

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for ZB23/01383/CLP, with what the planning evidence pack adds for this site.

Every application in North Yorkshire · Alerts for applications and incidents near here

  • 3 July 2023 Planning application submitted

None found. The register holds no published incident that names Leeming Bar Sewage Treatment, Blow Houses To Leeming Bridge - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Leeming Bar Sewage Treatment, Blow Houses To Leeming Bridge - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Leeming Bar Sewage Treatment, Blow Houses To Leeming Bridge - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Leeming Bar Sewage Treatment, Blow Houses To Leeming Bridge - Solar Panels?
Application Submitted, in the Renewable Energy Planning Database (UK government), where it last changed on 26 July 2023.
Where is Leeming Bar Sewage Treatment, Blow Houses To Leeming Bridge - Solar Panels?
8.1 km south-west of Northallerton, North Yorkshire, United Kingdom (postcode DL7 9RU).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).