Planning pack for this site, £295Other options

Solar · United Kingdom

Low Farm, Flockton - Solar Photovoltaic Farm

Operator Downing LLP

Awaiting Construction49.9 MWData checked 16 November 2026Source record dated 30 September 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Low Farm, Flockton - Solar Photovoltaic Farm is a 49.9 MW solar farm 5 km south-west of Horbury, West Yorkshire, United Kingdom. Its planning application (2021/62/93644/E) went to Kirklees on 14 September 2021 and was granted on 24 August 2022. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 39 other energy sites within 10 km, 35 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

DOWNING LLP (OC341575), active, since 2008. 4 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Low Farm, Flockton - Solar Photovoltaic Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-2771, Fire involves rooftop solar panels and lithium batteries on Bradford house roof, 16 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-27712024Fire involves rooftop solar panels and lithium batteries on Bradford house roof16 kmMinor
EIR-15522023Fire starts in solar panels on commercial roof in Doncaster45 kmSignificant
EIR-12442018Fire reported to have started in solar panels at Westleigh primary school61 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
49.9 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Downing LLP
Location
Low Farm, Wakefield Road, Flockton, Huddersfield, West Yorkshire, WF4 4BB, United Kingdom
Planning authority
Kirklees
Planning application
2021/62/93644/E

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 2021/62/93644/E, with what the planning evidence pack adds for this site.

Every application in Kirklees · Alerts for applications and incidents near here

  • 14 September 2021 Planning application submitted
  • 24 August 2022 Planning permission granted
  • 24 August 2025 Planning permission expired

None found. The register holds no published incident that names Low Farm, Flockton - Solar Photovoltaic Farm. If you know of one, report it (confidential reports are anonymised).

Has Low Farm, Flockton - Solar Photovoltaic Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Low Farm, Flockton - Solar Photovoltaic Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Low Farm, Flockton - Solar Photovoltaic Farm?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 30 September 2025.
Where is Low Farm, Flockton - Solar Photovoltaic Farm?
5 km south-west of Horbury, West Yorkshire, United Kingdom (postcode WF4 4BB).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).