Planning pack for this site, £295Other options

Solar · United Kingdom

H M Prison & Young Offender Institution - Solar Photovoltaic Panels

Operator Her Majesty's Prison & Probation Service

Awaiting Construction0.2 MWData checked 16 November 2026Source record dated 14 December 2021

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

H M Prison & Young Offender Institution - Solar Photovoltaic Panels is a 0.2 MW solar farm 4.4 km south-west of Horbury, West Yorkshire, United Kingdom. Its planning application (21/02504/CPL) went to Wakefield on 8 October 2021 and was granted on 9 December 2021. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 28 other energy sites within 10 km, 24 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for H M Prison & Young Offender Institution - Solar Photovoltaic Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-2771, Fire involves rooftop solar panels and lithium batteries on Bradford house roof, 17 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-27712024Fire involves rooftop solar panels and lithium batteries on Bradford house roof17 kmMinor
EIR-15522023Fire starts in solar panels on commercial roof in Doncaster44 kmSignificant
EIR-12442018Fire reported to have started in solar panels at Westleigh primary school62 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Her Majesty's Prison & Probation Service
Location
H M Prison And Young Offender Institution, New Hall Way, Flockton, Wakefield, West Yorkshire, WF4 4XX, United Kingdom
Planning authority
Wakefield
Planning application
21/02504/CPL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 21/02504/CPL, with what the planning evidence pack adds for this site.

Every application in Wakefield · Alerts for applications and incidents near here

  • 8 October 2021 Planning application submitted
  • 9 December 2021 Planning permission granted

None found. The register holds no published incident that names H M Prison & Young Offender Institution - Solar Photovoltaic Panels. If you know of one, report it (confidential reports are anonymised).

Has H M Prison & Young Offender Institution - Solar Photovoltaic Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names H M Prison & Young Offender Institution - Solar Photovoltaic Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of H M Prison & Young Offender Institution - Solar Photovoltaic Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 14 December 2021.
Where is H M Prison & Young Offender Institution - Solar Photovoltaic Panels?
4.4 km south-west of Horbury, West Yorkshire, United Kingdom (postcode WF4 4XX).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).