← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Solar · Stockton-on-Tees

Norton Bottoms

Application Withdrawn5 MWApplication 16/0431/OUTSubmitted 18 February 2016Withdrawn 28 February 2017

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
16/0431/OUT
Planning authority
Stockton-on-Tees
County or area
County Durham
Nation
England
Technology
Solar
Capacity
5 MW
Status
Application Withdrawn (Planning Application Withdrawn)
Operator or applicant
Billingham Valley Developments
Location
Land at Norton Bottoms, Fleet Bridge Road, Portrack Interchange Business, Stockton-On-Tees, TS18 2AD
  • 18 February 2016 Planning application submitted
  • 28 February 2017 Application withdrawn

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1502, Storm Eowyn damages solar panels at Newton Aycliffe Leisure Centre, 18 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15022025Storm Eowyn damages solar panels at Newton Aycliffe Leisure Centre18 kmMinor
EIR-11752026Rooftop solar panel fire guts NHS mental health ward in Malton59 kmSignificant
EIR-14992025Solar panels linked to fires at council buildings in Northumberland59 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near TS18 2AD is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Stockton-on-Tees.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.