Battery storage · United Kingdom

The Brick Bank

Operator Levington Developments

Planning Permission Expired7 MWData checked 16 November 2026Source record dated 11 October 2023

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

The Brick Bank is a 7 MW battery storage site on the edge of Stockton-on-Tees, County Durham, United Kingdom. Its planning application (18/1521/FUL) went to Stockton-on-Tees on 12 July 2018 and was granted on 8 January 2019. Its status in the Renewable Energy Planning Database (UK government) is planning permission expired. There are 72 other energy sites within 10 km, 20 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

342 energy sites within 40 km for The Brick Bank

Members see the sites and incidents around this one, and every record behind them.

Technology
Battery storage (Stand-alone Storage)
Capacity
7 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Planning Permission Expired
Operator or applicant
Levington Developments
Location
Land, Malleable Way, Stockton-On-Tees, Cleveland, County Durham, TS18 2QX, United Kingdom
Planning authority
Stockton-on-Tees
Planning application
18/1521/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 18/1521/FUL, with what the planning evidence pack adds for this site.

Every application in Stockton-on-Tees · Alerts for applications and incidents near here

  • 12 July 2018 Planning application submitted
  • 8 January 2019 Planning permission granted
  • 8 January 2022 Planning permission expired

None found. The register holds no published incident that names The Brick Bank. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has The Brick Bank had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names The Brick Bank; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of The Brick Bank?
Planning Permission Expired, in the Renewable Energy Planning Database (UK government), where it last changed on 11 October 2023.
Where is The Brick Bank?
On the edge of Stockton-on-Tees, County Durham, United Kingdom (postcode TS18 2QX).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).