← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Solar · Renfrewshire

Middleton Road, Linwood - Solar Photovoltaic Panels

Awaiting Construction1.6 MWApplication 24/0248/PPSubmitted 15 April 2024Granted 23 January 2025

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
24/0248/PP
Planning authority
Renfrewshire
Nation
Scotland
Technology
Solar
Capacity
1.6 MW
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Scottish Water Horizons
Location
Former Water Treatment Works, Middleton Road, Linwood, Paisley, Strathclyde, PA3 3DP
  • 15 April 2024 Planning application submitted
  • 23 January 2025 Planning permission granted
  • 23 January 2028 Planning permission expired Date as recorded in the register

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1238, Leak from solar heating system at Carnegie Leisure Centre Dunfermline, 68 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12382019Leak from solar heating system at Carnegie Leisure Centre Dunfermline68 kmMinor
EIR-20162022Solar panel fire evacuates Hawick High School117 kmSignificant
EIR-14762026House fire reported to have started on solar panels in Carnoustie131 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near PA3 3DP is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Renfrewshire.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.