Middleton Road, Linwood - Solar Photovoltaic Panels

Operator Scottish Water Horizons

Operational1.6 MWData checked 16 November 2026Source record dated 22 September 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Middleton Road, Linwood - Solar Photovoltaic Panels is a 1.6 MW solar farm in Linwood, Renfrewshire, United Kingdom. Its planning application (24/0248/PP) went to Renfrewshire on 15 April 2024 and was granted on 23 January 2025. It has been operating since 1 August 2026. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 42 other energy sites within 10 km, 17 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 12 other sites and 399 energy sites within 40 km for Middleton Road, Linwood - Solar Photovoltaic Panels

Members see the sites and incidents around this one, and every record behind them.

SCOTTISH WATER HORIZONS LIMITED (SC264806), active, since 2004. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
1.6 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Scottish Water Horizons
Location
Former Water Treatment Works, Middleton Road, Linwood, Paisley, Strathclyde, Renfrewshire, PA3 3DP, United Kingdom
Planning authority
Renfrewshire
Planning application
24/0248/PP
First operating
2026

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 24/0248/PP, with what the planning evidence pack adds for this site.

Every application in Renfrewshire · Alerts for applications and incidents near here

Status changed from Awaiting Construction to Operational on 16 November 2026.

  • 15 April 2024 Planning application submitted
  • 23 January 2025 Planning permission granted
  • 1 January 2026 Construction started
  • 1 August 2026 Operational

None found. The register holds no published incident that names Middleton Road, Linwood - Solar Photovoltaic Panels. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Middleton Road, Linwood - Solar Photovoltaic Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Middleton Road, Linwood - Solar Photovoltaic Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Middleton Road, Linwood - Solar Photovoltaic Panels?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 16 November 2026.
Where is Middleton Road, Linwood - Solar Photovoltaic Panels?
In Linwood, Renfrewshire, United Kingdom (postcode PA3 3DP).