← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Solar · Flintshire

Llanasa Waste Treatment Works

Application Withdrawn0.9 MWApplication 59395Submitted 25 January 2019Withdrawn 23 April 2019

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
59395
Planning authority
Flintshire
Nation
Wales
Technology
Solar
Capacity
0.9 MW
Status
Application Withdrawn (Planning Application Withdrawn)
Operator or applicant
Dwr Cymru Welsh Water
Location
Llanasa Waste Treatment Works, Ffynnongroyw, Gwespyr, Holywell, Clwyd, CH8 9JP
  • 25 January 2019 Planning application submitted
  • 23 April 2019 Application withdrawn

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1244, Fire reported to have started in solar panels at Westleigh primary school, 56 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12442018Fire reported to have started in solar panels at Westleigh primary school56 kmSignificant
EIR-14002023Solar panel and battery fire at a bungalow on Anglesey61 kmMinor
EIR-07522024Storm Darragh damages newly commissioned Anglesey solar farm panels69 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near CH8 9JP is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Flintshire.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.