← Back to the applications
Full planning pack, £295Other options

Planning application · Solar · Flintshire

Dara Sealand, Marsh Farm Road - Solar Arrays

Application Submitted3 MWApplication FUL/000586/26Submitted 9 July 2026

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
FUL/000586/26
Planning authority
Flintshire
County or area
Clwyd
Nation
Wales
Technology
Solar
Capacity
3 MW
Status
Application Submitted (Planning Application Submitted)
Operator or applicant
EMCOR UK
Location
Dara Sealand, Marsh Farm Road, Sealand, Deeside, CH5 2LS
  • 9 July 2026 Planning application submitted

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1244, Fire reported to have started in solar panels at Westleigh primary school, 44 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12442018Fire reported to have started in solar panels at Westleigh primary school44 kmSignificant
EIR-15532017Roof fire involving 14 solar panels attended in Shropshire49 kmMinor
EIR-14852026Faulty solar panel wiring sparks house fire in Stoke-on-Trent58 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near CH5 2LS is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Flintshire.

Data updated 13 November 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.