← Back to Clwyd
Planning pack for this site, £295Other options

Solar · United Kingdom

Iceland Foods, Second Avenue - Solar Photovoltaic Array

Operator Iceland Frozen Foods Plc

Awaiting ConstructionData checked 16 November 2026Source record dated 22 February 2023

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Iceland Foods, Second Avenue - Solar Photovoltaic Array is a solar farm 4.2 km north-east of Deeside, Clwyd, United Kingdom. Its planning application (FUL/000711/22) went to Flintshire on 23 November 2022 and was granted on 4 January 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 55 other energy sites within 10 km, 32 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Iceland Foods, Second Avenue - Solar Photovoltaic Array sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1244, Fire reported to have started in solar panels at Westleigh primary school, 44 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12442018Fire reported to have started in solar panels at Westleigh primary school44 kmSignificant
EIR-15532017Roof fire involving 14 solar panels attended in Shropshire50 kmMinor
EIR-14852026Faulty solar panel wiring sparks house fire in Stoke-on-Trent59 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Iceland Frozen Foods Plc
Location
Iceland Foods Plc, Second Avenue, Sealand, Deeside, Clwyd, CH5 2NW, United Kingdom
Planning authority
Flintshire
Planning application
FUL/000711/22

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for FUL/000711/22, with what the planning evidence pack adds for this site.

Every application in Flintshire · Alerts for applications and incidents near here

  • 23 November 2022 Planning application submitted
  • 4 January 2023 Planning permission granted
  • 4 January 2028 Planning permission runs out

None found. The register holds no published incident that names Iceland Foods, Second Avenue - Solar Photovoltaic Array. If you know of one, report it (confidential reports are anonymised).

Has Iceland Foods, Second Avenue - Solar Photovoltaic Array had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Iceland Foods, Second Avenue - Solar Photovoltaic Array; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Iceland Foods, Second Avenue - Solar Photovoltaic Array?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 22 February 2023.
Where is Iceland Foods, Second Avenue - Solar Photovoltaic Array?
4.2 km north-east of Deeside, Clwyd, United Kingdom (postcode CH5 2NW).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).