Onshore wind · United Kingdom
Kingspan
Operator Kingspan
Operational1.8 MWData checked 16 November 2026Source record dated 22 January 2019
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Kingspan is a 1.8 MW wind farm on the edge of Holywell, Flintshire, United Kingdom. Its planning application (52922) went to Flintshire on 19 November 2014 and was granted on 14 April 2015. It has been operating since 11 January 2019. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 5 other energy sites within 10 km, 2 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Kingspan changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 1.8 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Kingspan
- Location
- Kingspan Ltd, 2-4 Bagillt Road, Greenfield, Holywell, Flintshire, CH8 7GJ, United Kingdom
- Planning authority
- Flintshire
- Planning application
- 52922
- First operating
- 2019
- Turbines
- 2, 78 m to tip
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 52922, with what the planning evidence pack adds for this site.
Every application in Flintshire · Alerts for applications and incidents near here
Timeline
- 19 November 2014 Planning application submitted
- 14 April 2015 Planning permission granted
- 19 March 2018 Construction started
- 11 January 2019 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Kingspan. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Kingspan had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Kingspan; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Kingspan?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 22 January 2019.
- Where is Kingspan?
- On the edge of Holywell, Flintshire, United Kingdom (postcode CH8 7GJ).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).