Solar · United Kingdom

Sherburn

Operator Kingspan

Operational5 MWData checked 16 November 2026Source record dated 3 November 2017

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Sherburn is a 5 MW solar farm 14 km south-west of Scarborough, North Yorkshire, United Kingdom. Its planning application (14/00132/MFUL) went to North Yorkshire on 31 January 2014. It has been operating since 20 January 2016. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 20 other energy sites within 10 km, 6 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 1 other site and 135 energy sites within 40 km for Sherburn

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Kingspan
Location
Widespan Works, Sherburn, Malton, North Yorkshire, YO17 8PQ, United Kingdom
Planning authority
North Yorkshire
Planning application
14/00132/MFUL
First operating
2016

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 14/00132/MFUL, with what the planning evidence pack adds for this site.

Every application in North Yorkshire · Alerts for applications and incidents near here

  • 31 January 2014 Planning application submitted
  • 20 January 2016 Operational
  • 30 November 2016 Construction started

None found. The register holds no published incident that names Sherburn. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Sherburn had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Sherburn; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Sherburn?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 3 November 2017.
Where is Sherburn?
14 km south-west of Scarborough, North Yorkshire, United Kingdom (postcode YO17 8PQ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).