Planning application · Onshore wind · Flintshire

Kingspan

Operational1.8 MWApplication 52922Submitted 19 November 2014Granted 14 April 2015

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
52922
Planning authority
Flintshire
Nation
Wales
Technology
Onshore wind
Capacity
1.8 MW
Status
Operational
Operator or applicant
Kingspan
Location
Kingspan Ltd, 2-4 Bagillt Road, Greenfield, Holywell, CH8 7GJ
Turbines
2, 78 m to tip
First operating
2019
  • 19 November 2014 Planning application submitted
  • 14 April 2015 Planning permission granted
  • 19 March 2018 Construction started
  • 11 January 2019 Operational

The pack for this site lists 43 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-0732, Nordex turbine damaged by suspected lightning strike at UK wind farm, 67 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-07322026Nordex turbine damaged by suspected lightning strike at UK wind farm67 kmMinor
EIR-16242026Crane topples on Scout Moor wind farm project76 kmMajor
EIR-07902022Nordex attributes a Welsh wind turbine collapse to an overspeed condition117 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 40 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near CH8 7GJ is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Flintshire.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.