← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Solar · Somerset

Hurlingpot Farm

Appeal Refused5.3 MWApplication 2012/1562Submitted 13 August 2012Refused on appeal 19 December 2013

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
2012/1562
Planning authority
Somerset
Nation
England
Technology
Solar
Capacity
5.3 MW
Status
Appeal Refused
Operator or applicant
AEE Renewables
Location
Doulting, BA4 4PT
  • 13 August 2012 Planning application submitted
  • 11 January 2013 Planning permission refused
  • 19 December 2013 Appeal refused

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1524, Fire at a solar PV equipped house in Stoney Stratton, 4.7 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15242025Fire at a solar PV equipped house in Stoney Stratton4.7 kmSignificant
EIR-20652021Loft fire believed caused by a solar panel at Paintworks flats in Bristol28 kmMinor
EIR-14162025Fire at Bristol hospital started in solar panels28 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near BA4 4PT is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Somerset.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.