Solar · United Kingdom

Hurlingpot Farm

Operator AEE Renewables

Appeal Refused5.3 MWData checked 16 November 2026Source record dated 20 January 2014

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Hurlingpot Farm is a 5.3 MW solar farm on the edge of Shepton Mallet, Somerset, United Kingdom. Its planning application (2012/1562) went to Somerset on 13 August 2012 and was refused on appeal on 19 December 2013. Its status in the Renewable Energy Planning Database (UK government) is appeal refused. There are 32 other energy sites within 10 km, 27 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 19 other sites and 456 energy sites within 40 km for Hurlingpot Farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
5.3 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Appeal Refused
Operator or applicant
AEE Renewables
Location
Doulting, Somerset, BA4 4PT, United Kingdom
Planning authority
Somerset
Planning application
2012/1562

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 2012/1562, with what the planning evidence pack adds for this site.

Every application in Somerset · Alerts for applications and incidents near here

  • 13 August 2012 Planning application submitted
  • 11 January 2013 Planning permission refused
  • 19 December 2013 Appeal refused

None found. The register holds no published incident that names Hurlingpot Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Hurlingpot Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Hurlingpot Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Hurlingpot Farm?
Appeal Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 20 January 2014.
Where is Hurlingpot Farm?
On the edge of Shepton Mallet, Somerset, United Kingdom (postcode BA4 4PT).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).