Planning application · Solar · Kingston upon Thames

Hook Rise Business Centre, Hook Rise South - Solar Panels

Awaiting Construction0.2 MWApplication 23/02299/PRASubmitted 22 August 2023Granted 13 October 2023

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
23/02299/PRA
Planning authority
Kingston upon Thames
County or area
London
Nation
England
Technology
Solar
Capacity
0.2 MW
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Big Yellow Group Plc
Location
Unit 1, 225 Hook Rise Business Centre, Hook Rise South, Surbiton, KT6 7LD
  • 22 August 2023 Planning application submitted
  • 13 October 2023 Planning permission granted

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1512, Solar panels involved in fire at school in Carshalton, 9.1 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15122024Solar panels involved in fire at school in Carshalton9.1 kmMinor
EIR-13052017Fire at Thornton Heath flats reported to have been caused by an overheated solar panel14 kmSignificant
EIR-07742023Solar panel fire destroys roof of Ealing Council house in Greenford19 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near KT6 7LD is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Kingston upon Thames.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.