← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Solar · Kingston upon Thames

Charrington Bowl, Kingston Road - Solar Panels

Application Refused0.3 MWApplication 22/02516/PRASubmitted 27 September 2022Refused 25 October 2022

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
22/02516/PRA
Planning authority
Kingston upon Thames
County or area
Surrey
Nation
England
Technology
Solar
Capacity
0.3 MW
Status
Application Refused (Planning Permission Refused)
Operator or applicant
Mayfair Capital Property Unit Trust
Location
Charrington Bowl Kingston Road Tolworth, KT5 9PB
  • 27 September 2022 Planning application submitted
  • 25 October 2022 Planning permission refused

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1512, Solar panels involved in fire at school in Carshalton, 8.4 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15122024Solar panels involved in fire at school in Carshalton8.4 kmMinor
EIR-13052017Fire at Thornton Heath flats reported to have been caused by an overheated solar panel13 kmSignificant
EIR-07742023Solar panel fire destroys roof of Ealing Council house in Greenford18 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near KT5 9PB is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Kingston upon Thames.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.