Solar · United Kingdom
Charrington Bowl, Kingston Road - Solar Panels
Operator Mayfair Capital Property Unit Trust
Application Refused0.3 MWData checked 16 November 2026Source record dated 1 November 2022
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Charrington Bowl, Kingston Road - Solar Panels is a 0.3 MW solar farm in Tolworth, Surrey, United Kingdom. Its planning application (22/02516/PRA) went to Kingston upon Thames on 27 September 2022 and was refused on 25 October 2022. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 47 other energy sites within 10 km, 35 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Charrington Bowl, Kingston Road - Solar Panels changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 0.3 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Application Refused (Planning Permission Refused)
- Operator or applicant
- Mayfair Capital Property Unit Trust
- Location
- Charrington Bowl Kingston Road Tolworth, Surrey, KT5 9PB, United Kingdom
- Planning authority
- Kingston upon Thames
- Planning application
- 22/02516/PRA
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 22/02516/PRA, with what the planning evidence pack adds for this site.
Every application in Kingston upon Thames · Alerts for applications and incidents near here
Timeline
- 27 September 2022 Planning application submitted
- 25 October 2022 Planning permission refused
Incidents on the register at this site
None found. The register holds no published incident that names Charrington Bowl, Kingston Road - Solar Panels. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Charrington Bowl, Kingston Road - Solar Panels had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Charrington Bowl, Kingston Road - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Charrington Bowl, Kingston Road - Solar Panels?
- Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 1 November 2022.
- Where is Charrington Bowl, Kingston Road - Solar Panels?
- In Tolworth, Surrey, United Kingdom (postcode KT5 9PB).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).