← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Solar · Dumfries and Galloway

East Culkae Farm

Planning Permission Expired5 MWApplication 14/P/1/0576Submitted 18 September 2014Granted 4 December 2014

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
14/P/1/0576
Planning authority
Dumfries and Galloway
Nation
Scotland
Technology
Solar
Capacity
5 MW
Status
Planning Permission Expired
Operator or applicant
Neo Environmental
Location
East Culkae Farm, Sorbie, DG8 8EP
  • 18 September 2014 Planning application submitted
  • 4 December 2014 Planning permission granted
  • 4 December 2017 Planning permission expired

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-2016, Solar panel fire evacuates Hawick High School, 127 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-20162022Solar panel fire evacuates Hawick High School127 kmSignificant
EIR-12382019Leak from solar heating system at Carnegie Leisure Centre Dunfermline156 kmMinor
EIR-14002023Solar panel and battery fire at a bungalow on Anglesey164 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near DG8 8EP is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Dumfries and Galloway.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.