← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Solar · Rother

Darvell Bruderhof Community, Brightling Road - Solar Panels

Awaiting Construction0.5 MWApplication RR/2022/2208/PSubmitted 1 September 2022Granted 18 November 2022

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
RR/2022/2208/P
Planning authority
Rother
County or area
East Sussex
Nation
England
Technology
Solar
Capacity
0.5 MW
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Darvell Bruderhof Community
Location
Darvell Bruderhof Community, Brightling Road, Salehurst, TN32 5DR
  • 1 September 2022 Planning application submitted
  • 18 November 2022 Planning permission granted
  • 18 November 2025 Planning permission expired

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1303, Solar panel inverter fault destroys two Lewes homes, 35 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-13032017Solar panel inverter fault destroys two Lewes homes35 kmSignificant
EIR-15272023Fire affects solar panels on nursing home roof in Woodingdean42 kmMinor
EIR-15222026Fire damages roof with one solar panel in The Charltons43 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near TN32 5DR is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Rother.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.