Solar · United Kingdom
Northpoint, Compass Park - Solar Panels
Operator RAAFT
Application Refused0.2 MWData checked 16 November 2026Source record dated 22 January 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Northpoint, Compass Park - Solar Panels is a 0.2 MW solar farm 8.1 km north of Battle, East Sussex, United Kingdom. Its planning application (RR/2025/636/PN2) went to Rother on 6 June 2025 and was refused on 1 August 2025. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 18 other energy sites within 10 km, 12 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Northpoint, Compass Park - Solar Panels changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 0.2 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Application Refused (Planning Permission Refused)
- Operator or applicant
- RAAFT
- Location
- Northpoint, Second Floor, Compass Park, Staplecross, Ewhurst, East Sussex, TN32 5BS, United Kingdom
- Planning authority
- Rother
- Planning application
- RR/2025/636/PN2
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for RR/2025/636/PN2, with what the planning evidence pack adds for this site.
Every application in Rother · Alerts for applications and incidents near here
Timeline
- 6 June 2025 Planning application submitted
- 1 August 2025 Planning permission refused
Incidents on the register at this site
None found. The register holds no published incident that names Northpoint, Compass Park - Solar Panels. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Northpoint, Compass Park - Solar Panels had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Northpoint, Compass Park - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Northpoint, Compass Park - Solar Panels?
- Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 22 January 2026.
- Where is Northpoint, Compass Park - Solar Panels?
- 8.1 km north of Battle, East Sussex, United Kingdom (postcode TN32 5BS).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).