Battery storage · United Kingdom
Lower Ellenden Farm, Water Lane - Battery Storage
Operator RNA Energy Limited
Application RefusedData checked 16 November 2026Source record dated 12 May 2025
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
Lower Ellenden Farm, Water Lane - Battery Storage is a battery storage site 12 km west of Tenterden, Kent, United Kingdom. Its planning application (24/01768/FULL) went to Tunbridge Wells on 18 July 2024 and was refused on 1 May 2025. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 18 other energy sites within 10 km, 8 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when Lower Ellenden Farm, Water Lane - Battery Storage changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Battery storage (Stand-alone Storage)
- Status
- Application Refused (Planning Permission Refused)
- Operator or applicant
- RNA Energy Limited
- Location
- Lower Ellenden Farm, Water Lane, Hawkhurst, Cranbrook, Kent, TN18 5AX, United Kingdom
- Planning authority
- Tunbridge Wells
- Planning application
- 24/01768/FULL
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 24/01768/FULL, with what the planning evidence pack adds for this site.
Every application in Tunbridge Wells · Alerts for applications and incidents near here
Timeline
- 18 July 2024 Planning application submitted
- 1 May 2025 Planning permission refused
Incidents on the register at this site
None found. The register holds no published incident that names Lower Ellenden Farm, Water Lane - Battery Storage. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Lower Ellenden Farm, Water Lane - Battery Storage had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Lower Ellenden Farm, Water Lane - Battery Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Lower Ellenden Farm, Water Lane - Battery Storage?
- Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 12 May 2025.
- Where is Lower Ellenden Farm, Water Lane - Battery Storage?
- 12 km west of Tenterden, Kent, United Kingdom (postcode TN18 5AX).