← Back to Kent
Planning pack for this site, £295Other options

Solar · United Kingdom

Lower Ellenden Farm - Solar Farm & Battery Energy Storage

Operator RNA Energy limited

Revised6 MWData checked 16 November 2026Source record dated 4 October 2022

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Lower Ellenden Farm - Solar Farm & Battery Energy Storage is a 6 MW solar farm 12 km south of Staplehurst, Kent, United Kingdom. Its planning application (22/01884/FULL) went to Tunbridge Wells on 14 July 2022 and was withdrawn on 22 September 2022. Its status in the Renewable Energy Planning Database (UK government) is revised. There are 18 other energy sites within 10 km, 9 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Lower Ellenden Farm - Solar Farm & Battery Energy Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0109, Fire in single battery unit at Thurrock BESS under construction, 48 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-01092025Fire in single battery unit at Thurrock BESS under construction48 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire185 kmSignificant
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells255 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
6 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Revised
Operator or applicant
RNA Energy limited
Location
Lower Ellenden Farm, Water Lane, Hawkhurst, Cranbrook, Kent, TN18 5AX, United Kingdom
Planning authority
Tunbridge Wells
Planning application
22/01884/FULL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 22/01884/FULL, with what the planning evidence pack adds for this site.

Every application in Tunbridge Wells · Alerts for applications and incidents near here

  • 14 July 2022 Planning application submitted
  • 22 September 2022 Application withdrawn

None found. The register holds no published incident that names Lower Ellenden Farm - Solar Farm & Battery Energy Storage. If you know of one, report it (confidential reports are anonymised).

Has Lower Ellenden Farm - Solar Farm & Battery Energy Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Lower Ellenden Farm - Solar Farm & Battery Energy Storage; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Lower Ellenden Farm - Solar Farm & Battery Energy Storage?
Revised, in the Renewable Energy Planning Database (UK government), where it last changed on 4 October 2022.
Where is Lower Ellenden Farm - Solar Farm & Battery Energy Storage?
12 km south of Staplehurst, Kent, United Kingdom (postcode TN18 5AX).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).