← Back to East Sussex
Planning pack for this site, £295Other options

Solar · United Kingdom

Darvell Bruderhof Community, Brightling Road - Solar Panels

Operator Darvell Bruderhof Community

Awaiting Construction0.5 MWData checked 16 November 2026Source record dated 5 December 2022

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Darvell Bruderhof Community, Brightling Road - Solar Panels is a 0.5 MW solar farm 7.6 km north of Battle, East Sussex, United Kingdom. Its planning application (RR/2022/2208/P) went to Rother on 1 September 2022 and was granted on 18 November 2022. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 13 other energy sites within 10 km, 10 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Darvell Bruderhof Community, Brightling Road - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1303, Solar panel inverter fault destroys two Lewes homes, 35 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-13032017Solar panel inverter fault destroys two Lewes homes35 kmSignificant
EIR-15272023Fire affects solar panels on nursing home roof in Woodingdean42 kmMinor
EIR-15222026Fire damages roof with one solar panel in The Charltons43 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Darvell Bruderhof Community
Location
Darvell Bruderhof Community, Brightling Road, Salehurst, East Sussex, TN32 5DR, United Kingdom
Planning authority
Rother
Planning application
RR/2022/2208/P

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for RR/2022/2208/P, with what the planning evidence pack adds for this site.

Every application in Rother · Alerts for applications and incidents near here

  • 1 September 2022 Planning application submitted
  • 18 November 2022 Planning permission granted
  • 18 November 2025 Planning permission expired

None found. The register holds no published incident that names Darvell Bruderhof Community, Brightling Road - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Darvell Bruderhof Community, Brightling Road - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Darvell Bruderhof Community, Brightling Road - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Darvell Bruderhof Community, Brightling Road - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 5 December 2022.
Where is Darvell Bruderhof Community, Brightling Road - Solar Panels?
7.6 km north of Battle, East Sussex, United Kingdom (postcode TN32 5DR).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).