← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Solar · Bournemouth, Christchurch and Poole

Chapel Lane Parley Solar Farm Phase 3

Operational4 MWApplication 8/14/0412Submitted 28 August 2014Granted 30 January 2015

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
8/14/0412
Planning authority
Bournemouth, Christchurch and Poole
County or area
Dorset
Nation
England
Technology
Solar
Capacity
4 MW
Status
Operational
Operator or applicant
Eco Sustainable Solutions
Location
Chapel Lane, Parley, Christchurch, Dorset, BH23 6BG
First operating
2015
  • 28 August 2014 Planning application submitted
  • 30 January 2015 Planning permission granted
  • 1 September 2015 Operational

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1516, Solar panels suspected in house roof fire in Ferndown, 1.5 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15162025Solar panels suspected in house roof fire in Ferndown1.5 kmSignificant
EIR-15322023Roof-space fire involving a solar inverter at a house in Ferndown1.9 kmSignificant
EIR-19642022Fire damages solar panels at Verwood farm during heatwave8.6 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near BH23 6BG is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Bournemouth, Christchurch and Poole.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.