Solar · United Kingdom
Parley Renewable Energy Park (PV)
Operator Eco Sustainable Solutions
Application Refused5 MWData checked 16 November 2026Source record dated 21 September 2012
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Parley Renewable Energy Park (PV) is a 5 MW solar farm 3.5 km south-east of Ferndown, Dorset, United Kingdom. Its planning application (8/10/0604) went to Bournemouth, Christchurch and Poole on 23 December 2010 and was refused on 16 March 2011. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 37 other energy sites within 10 km, 28 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Parley Renewable Energy Park (PV) changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 5 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Application Refused (Planning Permission Refused)
- Operator or applicant
- Eco Sustainable Solutions
- Location
- Chapel Lane, Parley, Christchurch, Dorset, Dorset, BH23 6BG, United Kingdom
- Planning authority
- Bournemouth, Christchurch and Poole
- Planning application
- 8/10/0604
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 8/10/0604, with what the planning evidence pack adds for this site.
Every application in Bournemouth, Christchurch and Poole · Alerts for applications and incidents near here
Timeline
- 23 December 2010 Planning application submitted
- 16 March 2011 Planning permission refused
Incidents on the register at this site
None found. The register holds no published incident that names Parley Renewable Energy Park (PV). If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Parley Renewable Energy Park (PV) had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Parley Renewable Energy Park (PV); it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Parley Renewable Energy Park (PV)?
- Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 21 September 2012.
- Where is Parley Renewable Energy Park (PV)?
- 3.5 km south-east of Ferndown, Dorset, United Kingdom (postcode BH23 6BG).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).