← Back to Dorset

Solar · United Kingdom

Chapel Lane Parley Solar Farm Phase 3

Operator Eco Sustainable Solutions

Operational4 MWData checked 16 November 2026Source record dated 30 November 2015

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Chapel Lane Parley Solar Farm Phase 3 is a 4 MW solar farm on the edge of Ferndown, Dorset, United Kingdom. Its planning application (8/14/0412) went to Bournemouth, Christchurch and Poole on 28 August 2014 and was granted on 30 January 2015. It has been operating since 1 September 2015. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 39 other energy sites within 10 km, 29 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 2 other sites and 248 energy sites within 40 km for Chapel Lane Parley Solar Farm Phase 3

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
4 MW (this record)
All phases
60 MW, the phases on the register added up
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Eco Sustainable Solutions
Location
Chapel Lane, Parley, Christchurch, Dorset, Dorset, BH23 6BG, United Kingdom
Planning authority
Bournemouth, Christchurch and Poole
Planning application
8/14/0412
First operating
2015

This record is 4 MW, one part of a site built in phases. With Chapel Lane Parley Solar Farm Phase 2 (36 MW), Chapel Lane Parley Solar Farm Phase 1 (20 MW) the phases on the register add up to 60 MW. Chapel Lane Parley Solar Farm Phase 2 · Chapel Lane Parley Solar Farm Phase 1

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 8/14/0412, with what the planning evidence pack adds for this site.

Every application in Bournemouth, Christchurch and Poole · Alerts for applications and incidents near here

  • 28 August 2014 Planning application submitted
  • 30 January 2015 Planning permission granted
  • 1 September 2015 Operational

None found. The register holds no published incident that names Chapel Lane Parley Solar Farm Phase 3. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Chapel Lane Parley Solar Farm Phase 3 had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Chapel Lane Parley Solar Farm Phase 3; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Chapel Lane Parley Solar Farm Phase 3?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 30 November 2015.
Where is Chapel Lane Parley Solar Farm Phase 3?
On the edge of Ferndown, Dorset, United Kingdom (postcode BH23 6BG).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).