Chapel Lane Parley Solar Farm Phase 1

Operator Solar Power Generation Limited

Operational20 MWData checked 16 November 2026Source record dated 22 September 2014

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Chapel Lane Parley Solar Farm Phase 1 is a 20 MW solar farm 3.2 km south-east of Ferndown, Dorset, United Kingdom. Its planning application (8/12/0512) went to Bournemouth, Christchurch and Poole on 28 November 2012 and was granted on 28 March 2013. It has been operating since 31 March 2014. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 37 other energy sites within 10 km, 28 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 2 other sites and 247 energy sites within 40 km for Chapel Lane Parley Solar Farm Phase 1

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
20 MW (this record)
All phases
60 MW, the phases on the register added up
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Solar Power Generation Limited
Location
Parley (Adjacent to Ecos Sustainable Solutions Waste & Recycling Facility), Dorset, United Kingdom
Planning authority
Bournemouth, Christchurch and Poole
Planning application
8/12/0512
First operating
2014

This record is 20 MW, one part of a site built in phases. With Chapel Lane Parley Solar Farm Phase 2 (36 MW), Chapel Lane Parley Solar Farm Phase 3 (4 MW) the phases on the register add up to 60 MW. Chapel Lane Parley Solar Farm Phase 2 · Chapel Lane Parley Solar Farm Phase 3

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 8/12/0512, with what the planning evidence pack adds for this site.

Every application in Bournemouth, Christchurch and Poole · Alerts for applications and incidents near here

  • 28 November 2012 Planning application submitted
  • 28 March 2013 Planning permission granted
  • 10 January 2014 Construction started
  • 31 March 2014 Operational

None found. The register holds no published incident that names Chapel Lane Parley Solar Farm Phase 1. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Chapel Lane Parley Solar Farm Phase 1 had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Chapel Lane Parley Solar Farm Phase 1; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Chapel Lane Parley Solar Farm Phase 1?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 22 September 2014.
Where is Chapel Lane Parley Solar Farm Phase 1?
3.2 km south-east of Ferndown, Dorset, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).