← Back to Somerset

Solar · United Kingdom

PARK WOOD SOLAR FARM

Operator Solar Power Generation Limited

Operational5 MWData checked 16 November 2026Source record dated 13 July 2012

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

PARK WOOD SOLAR FARM is a 5 MW solar farm 5.2 km south-east of Street, Somerset, United Kingdom. Its planning application (2011/0781) went to Somerset on 4 May 2011 and was granted on 28 July 2011. It has been operating since 29 September 2011. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 16 other energy sites within 10 km, 14 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 2 other sites and 388 energy sites within 40 km for PARK WOOD SOLAR FARM

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Solar Power Generation Limited
Location
Park Wood, Butleigh, Glastonbury, Somerset, BA6, United Kingdom
Planning authority
Somerset
Planning application
2011/0781
First operating
2011

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 2011/0781, with what the planning evidence pack adds for this site.

Every application in Somerset · Alerts for applications and incidents near here

  • 4 May 2011 Planning application submitted
  • 28 July 2011 Planning permission granted
  • 29 September 2011 Operational

None found. The register holds no published incident that names PARK WOOD SOLAR FARM. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has PARK WOOD SOLAR FARM had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names PARK WOOD SOLAR FARM; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of PARK WOOD SOLAR FARM?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 13 July 2012.
Where is PARK WOOD SOLAR FARM?
5.2 km south-east of Street, Somerset, United Kingdom (postcode BA6).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).