Solar · United Kingdom

Higher Hill Farm (extension)

Operator British Solar Renewables · Owner Owl Investment Bidco Limited

Operational1.5 MWData checked 16 November 2026Source record dated 18 November 2016

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Higher Hill Farm (extension) is a 1.5 MW solar farm 5.9 km south-east of Street, Somerset, United Kingdom. Its planning application (2014/0646/FUL) went to Somerset on 14 May 2014 and was granted on 18 September 2014. It has been operating since 1 May 2016. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 25 other energy sites within 10 km, 23 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 61 other sites and 373 energy sites within 40 km for Higher Hill Farm (extension)

Members see the sites and incidents around this one, and every record behind them.

BRITISH SOLAR RENEWABLES LIMITED (07315867), active, since 2010. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
1.5 MW (this record)
All phases
6.5 MW, the phases on the register added up
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
British Solar Renewables
Owner
Owl Investment Bidco Limited
Location
Land At Higher Hill Farm, Butleigh Hill, Butleigh, Glastonbury, Somerset, Somerset, BA6 8TW, United Kingdom
Planning authority
Somerset
Planning application
2014/0646/FUL
First operating
2016

This record is 1.5 MW, one part of a site built in phases. With Higher Hill Farm (5 MW) the phases on the register add up to 6.5 MW. Higher Hill Farm

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 2014/0646/FUL, with what the planning evidence pack adds for this site.

Every application in Somerset · Alerts for applications and incidents near here

  • 14 May 2014 Planning application submitted
  • 18 September 2014 Planning permission granted
  • 15 September 2015 Construction started
  • 1 May 2016 Operational

None found. The register holds no published incident that names Higher Hill Farm (extension). If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Higher Hill Farm (extension) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Higher Hill Farm (extension); it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Higher Hill Farm (extension)?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 18 November 2016.
Where is Higher Hill Farm (extension)?
5.9 km south-east of Street, Somerset, United Kingdom (postcode BA6 8TW).