Planning application · Onshore wind · Fenland

Boardinghouse Wind Farm

Operational10.3 MWApplication F/YR09/0562/FSubmitted 20 August 2009Granted on appeal 6 July 2011

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
F/YR09/0562/F
Planning authority
Fenland
County or area
Cambridgeshire
Nation
England
Technology
Onshore wind
Capacity
10.3 MW
Status
Operational
Operator or applicant
Ecogen
Location
Knights End Road March Cambridgeshire
Appeal reference
10/00038/REF
Turbines
5
First operating
2015
  • 20 August 2009 Planning application submitted
  • 14 April 2010 Planning permission refused
  • 6 July 2011 Planning permission granted
  • 6 July 2011 Appeal granted
  • 28 July 2014 Construction started
  • 1 October 2015 Operational

The pack for this site lists 43 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-0895, Wind turbine catches fire at Doddington wind farm after storms, 4.1 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-08952018Wind turbine catches fire at Doddington wind farm after storms4.1 kmSignificant
EIR-20212022Wind turbine catches fire near Thorney in Lincolnshire15 kmSignificant
EIR-12752022Fire damages Siemens Gamesa turbine at French Farm wind farm19 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 40 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near Boardinghouse Wind Farm is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Fenland.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.