← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Onshore wind · Northumberland

Bewick Drift

Operational2.3 MWApplication CM/20060877Submitted 15 October 2006Granted on appeal 1 February 2008

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
CM/20060877
Planning authority
Northumberland
Nation
England
Technology
Onshore wind
Capacity
2.3 MW
Status
Operational
Operator or applicant
Harworth Power
Location
Land at former Lynemouth coal handling store north of existing Lynemouth Power Station
Turbines
1
First operating
2013
  • 15 October 2006 Planning application submitted
  • 30 May 2007 Planning permission refused
  • 1 February 2008 Planning permission granted
  • 1 February 2008 Appeal granted
  • 1 October 2012 Construction started
  • 31 March 2013 Operational

The pack for this site lists 43 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-1119, Wind turbine fire at Butterwick Wind Farm near Sedgefield, 63 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-11192019Wind turbine fire at Butterwick Wind Farm near Sedgefield63 kmMinor
EIR-08632017Fire destroys single turbine at Knabs Ridge wind farm near Harrogate136 kmSignificant
EIR-16242026Crane topples on Scout Moor wind farm project164 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 40 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near Bewick Drift is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Northumberland.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.