Solar · United Kingdom

New Moor Shaft

Operator Northumberland County Council

Abandoned4.2 MWData checked 16 November 2026Source record dated 21 June 2018

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

New Moor Shaft is a 4.2 MW solar farm on the edge of Ashington, Northumberland, United Kingdom. Its planning application (15/02357/CCD) went to Northumberland on 20 July 2015 and was granted on 2 September 2015. Its status in the Renewable Energy Planning Database (UK government) is abandoned. There are 35 other energy sites within 10 km, 16 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 3 other sites and 267 energy sites within 40 km for New Moor Shaft

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
4.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Abandoned
Operator or applicant
Northumberland County Council
Location
Land s/New Moor Shaft Cottages, Ellington Road, Ashington, Northumberland, Northumberland, NE63 9XS, United Kingdom
Planning authority
Northumberland
Planning application
15/02357/CCD

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 15/02357/CCD, with what the planning evidence pack adds for this site.

Every application in Northumberland · Alerts for applications and incidents near here

  • 20 July 2015 Planning application submitted
  • 2 September 2015 Planning permission granted
  • 2 September 2020 Planning permission expired

None found. The register holds no published incident that names New Moor Shaft. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has New Moor Shaft had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names New Moor Shaft; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of New Moor Shaft?
Abandoned, in the Renewable Energy Planning Database (UK government), where it last changed on 21 June 2018.
Where is New Moor Shaft?
On the edge of Ashington, Northumberland, United Kingdom (postcode NE63 9XS).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).