← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Onshore wind · East Lothian

Aikengall

Operational48 MWApplication 05/00216/FULSubmitted 24 February 2005Granted 16 March 2007

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
05/00216/FUL
Planning authority
East Lothian
County or area
Lothian
Nation
Scotland
Technology
Onshore wind
Capacity
48 MW
Status
Operational
Operator or applicant
Community Wind Power
Location
Aikengall Nr Innerwick Dunbar East Lothian EH42 1SG
Turbines
16, 125 m to tip
First operating
2008
  • 24 February 2005 Planning application submitted
  • 16 March 2007 Planning permission granted
  • 1 November 2008 Operational

The pack for this site lists 43 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-0441, Wind turbine collapses at Aviva's Pitheavlis site in Perth, 79 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-04412025Wind turbine collapses at Aviva's Pitheavlis site in Perth79 kmSignificant
EIR-13862022Wind turbine fire near St Cyrus in Aberdeenshire95 kmMinor
EIR-09112017Worker dies after fall from turbine at Whitelee windfarm near Glasgow113 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 40 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near Aikengall is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in East Lothian.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.