Faulty voltage transformer fire likely caused Singapore substation power outage
Jan 2019Published 5 Nov 2026Responsible editor: Chief Editor
Get the next one by email
Free alerts on grid infrastructure incidents in Singapore, and an email when EIR-2774 is updated. No account needed; unsubscribe in one click.
Confirm your email and every substation and transformer incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Companies named in the reporting of this entry (being named is not a finding of fault): SP PowerGrid
What happened
A voltage transformer at a substation in Bright Hill, Singapore, is the likely cause of a power outage on 26 January 2019 that lasted about 1.5 hours and affected around 27,000 residents. According to preliminary investigations by the Energy Market Authority, the transformer started a fire in the substation. Protective devices detected the fire and activated automatically to isolate the fault, which cut supply to consumers in Ang Mo Kio, Bishan, Sin Ming, Toa Payoh and Thomson.
Lifts stopped and traffic lights went dark. SP PowerGrid restored supply to 80 per cent of affected consumers within 30 minutes and to the remaining consumers within 90 minutes. The outage came months after a larger disruption in September 2018 that affected more than 146,000 residents.
Contributing factors
A faulty voltage transformer at the substation is the likely cause, based on preliminary findings. SP PowerGrid engaged the original equipment manufacturer's experts to establish whether the failure resulted from design, manufacturing or material defects. An independent expert was asked to review the manufacturer's findings and recommendations.
Lessons learned
- Protective devices that isolate a fault quickly help limit the area affected, but operators should check that settings and fault isolation are tuned to contain a substation fire.
- After a component fails, operators should consider raising monitoring frequency on the same equipment and prioritising its replacement in maintenance rounds.
- An independent review of the manufacturer's root cause findings helps establish whether a failure stems from design, manufacturing or material defects.