Transformer explosion cuts power across parts of Centurion
May 2025Published 4 Nov 2026Responsible editor: Chief Editor
Get the next one by email
Free alerts on grid infrastructure incidents in South Africa, and an email when EIR-2760 is updated. No account needed; unsubscribe in one click.
Confirm your email and every substation and transformer incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Companies named in the reporting of this entry (being named is not a finding of fault): Tshwane metro
What happened
On 20 May 2025, at around 05:50, Transformer 1A at the Zwartkop Substation in the Tshwane metro exploded, causing a power outage across multiple areas. The source reports fire damage to the Lyttelton/Kwagga Overhead Line 1 and does not say whether the transformer itself caught fire. The explosion also tripped the Lyttelton Line 1 at Njala, which initially cut supply to the Wingate, Aries and De Hoewes substations. Supply to those three areas was later restored.
Residents in Zwartkop, Valhalla, parts of Claudius, Clubview, the military base in Thaba Tshwane and Zwartkop Airbase remained without electricity while the metro's Energy and Electricity Department carried out restoration work. The fire-damaged Lyttelton/Kwagga Overhead Line 1 was due for repair, and the source gives the start of those repairs as 20 May.
Contributing factors
The source reports that the destruction of 630mm high-tension cables and essential substation control cables significantly complicated repairs. It also reports that cables for Transformer 2B had been stolen and had to be replaced. The source does not state the cause of the explosion.
Lessons learned
- Substation control and protection cabling should be physically secured, because cable theft can extend restoration times after an incident.
- After a transformer fault, oil sample analysis and full protection grading tests should be completed before the unit is re-energised.
- Operators should hold spare high-voltage cable and control cable stock so that repairs are not delayed by long procurement.
- Restoration updates should be published on a fixed schedule, so that affected customers know when to expect the next information.
More lessons on theft, arson and site security, electrical protection and isolation, outages, backup supply and restoration, from every incident on the register.
Source
Other entries that name Centurion
Published 2026-11-04. Written from public reporting. Descriptive, not investigative. See the data accuracy disclaimer.