Fire and explosion at Brakfontein Substation cuts power to Centurion suburbs
Apr 2025Published 7 Sept 2026Responsible editor: Chief Editor
- Where
- Brakfontein Substation, Centurion, South Africa
- Operator
- City of Tshwane
- What
- Fire and explosion damaged substation and cut power
- Cause
- Not reported
- Outcome
- Phased restoration ongoing ten days later
Get the next one by email
Free alerts on grid infrastructure incidents in South Africa, and an email when EIR-0514 is updated. No account needed; unsubscribe in one click.
Confirm your email and every substation and transformer incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Companies named in the reporting of this entry (being named is not a finding of fault): City of Tshwane
What happened
On 3 April 2025 a fire broke out at the Brakfontein Substation in Centurion, part of the City of Tshwane's electricity network, causing extensive damage and, according to reporting, an explosion that knocked out power to multiple suburbs including Rooihuiskraal North, Amberfield, Heuweloord, Monavoni, Eldoraigne, Celtisdal and parts of Wierdapark. As of ten days after the fire, restoration was still in progress in phases, with some areas restored and others still outstanding.
Technicians had to condition a repaired or replacement transformer through a soaking process to ensure insulation and windings could safely take load, then perform sequential tests before energising the substation. Power was being restored in phases, starting with Amberfield 1 and 2, prioritising critical infrastructure and essential services, with residents warned to stay away from the site during repairs.
Contributing factors
Extensive fire damage to substation equipment, described by City officials as requiring careful transformer conditioning and sequential testing before safe re-energisation. No specific ignition cause was disclosed in the source.
Lessons learned
- Substation transformer damage requires a soaking process to condition insulation before safe load, so operators must allow extra time in restoration plans.
- After major substation failure, phased re-energisation prioritising critical infrastructure limits further network instability.
More lessons on electrical protection and isolation, outages, backup supply and restoration, from every incident on the register.
Not yet known
- Specific cause of the fire
- Transformer model and age
- Total cost of damage and repairs
- Exact time to full power restoration
This entry is updated when these are reported. Get an alert for the next one like it.
Source
Other entries that name Centurion
Published 2026-09-07. Written from public reporting. Descriptive, not investigative. See the data accuracy disclaimer.