UPS failure during maintenance cuts power at Maidenhead data centre

May 2012Published 13 Oct 2026Responsible editor: Chief Editor

Estimated damageModelled by the register's adjusterHow? Know the real figure?
Figure hidden: shown to subscribersLow confidence
out of service for about •• daysShown in the record →Full estimate
From the recordRoot cause hiddenFailed part hidden

Companies named in this entry: Pulsant

On the night of 29 May 2012, Pulsant suffered a power disruption at its Maidenhead data centre that cut customer servers and firewalls off from the internet. During planned maintenance, an uninterruptible power supply (UPS) failed after a device swap. The company said a component changed during routine maintenance, a certified new manufacturer part, failed as the UPS was returned to service. The electrical load was taken over and then dropped, and customer racks connected to the failed UPS in the Maidenhead 2 and 3 facilities lost power.

The UPS was bypassed a few minutes later and power was restored, but some hosting customers were still recovering the next day after forced hard shutdowns. Pulsant initially described the problem as a network issue on its status page before reporting power issues. The UPS was awaiting full testing before being returned to service.

A component fitted during routine maintenance failed when the UPS was placed back into service. Pulsant said the part was certified and from a new manufacturer. Customers said the status page initially described the fault as a network problem, and that night staffing levels slowed recovery. Pulsant said six engineers were onsite when the power was lost.

  1. Test UPS units fully after any component replacement before returning them to service under load.
  2. Verify that replacement parts from new manufacturers are compatible and tested, not only certified.
  3. Keep status-page reporting accurate and update it promptly when the cause is identified as power rather than network.
  4. Plan maintenance so that a failed UPS does not drop load to customer racks, and confirm bypass and transfer paths work before work begins.
  5. Ensure out-of-hours staffing and escalation for hosting customers are adequate during maintenance windows.

More lessons on outages, backup supply and restoration, maintenance, inspection and ageing assets, from every incident on the register.

Published 2026-10-13. Written from public reporting. Descriptive, not investigative. See the data accuracy disclaimer.

See the register's stories first in Google: add it as a preferred source.

Chart to reuse with this story: Data centre incidents in the United Kingdom, by year, free with a credit (PNG).

Data centre incidents in the United Kingdom: 20 entries, with a free alert for the next one.

Browse the full register or submit an incident.